How Long Does It Take to Build an ADU in San Diego? (2026 Timeline)
From first meeting to move-in, most San Diego ADUs take 10–18 months. Here's an honest phase-by-phase breakdown — design, permits, construction — and the specific delays that stretch timelines.
